The Riverside Thames Project
Avoiding disruption with the Aladdin EasyFit Isolator
I have used EasyFit Isolation valves since about 2018 when I first discovered them in a trade magazine, I use them as my go to in situations I usually found myself in older buildings around London.
Typical situations being blocks of flats or commercial...
The Royal London Hospital
Argos / DHL Distribution Centre
Avoided a complete drain down with the Aladdin EasyFit Isolator
In a busy operation like the Stafford based DHL/Argos distribution centre, where services are running 24/7, even a minor operation like changing a washbasin hot tap requires a complete drain down.
In this instance, the pipework was poorly installed over 20 years...
Devonshire Place – London
Avoiding excavation works with the Aladdin EasyFit Isolator:
HVL Solutions were called to Devonshire Place London W1, on arrival they needed to isolate water supply to an apartment which had no control over their water supply.
Isolation was required to a 28mm copper line, with no isolation points available the only option...
Kier Group – Southwest Water
Meter Installations with the Aladdin EasyFit Isolator:
We are using the Aladdin valves where there is no internal or external stop tap, proving an invaluable tool in our arsenal in enabling customers to have a meter fitted where previously we would have had to feedback as “unable to meter”. Wendy Coomber (Kier...
Bloomsbury Hotel
Completing much needed maintenance in a fully occupied hotel, whilst overcoming problematic seized gate valves with the Aladdin EasyFit Isolator:
“Great product, fitted Aladdin EasyFit isolation valves to working mains in a 150 room hotel, all rooms fully occupied, by installing EasyFit isolation valves this allowed works to be completed...