17 Apr

The Riverside Thames Project

Avoiding disruption with the Aladdin EasyFit Isolator I have used EasyFit Isolation valves since about 2018 when I first discovered them in a trade magazine, I use them as my go to in situations I usually found myself in older buildings around London. Typical situations being blocks of flats or commercial...
17 Apr

The Royal London Hospital

Installation of the Da Vinci Machine Robot Arm Washer at the Royal London Hospital with the Aladdin EasyFit Isolator CSS Facilities was contracted to carry out the installation of the Da Vinci operating Robot arms washer within the CSSD Clean Room at the Royal London Hospital, part of the brief...
17 Apr

Argos / DHL Distribution Centre

Avoided a complete drain down with the Aladdin EasyFit Isolator In a busy operation like the Stafford based DHL/Argos distribution centre, where services are running 24/7, even a minor operation like changing a washbasin hot tap requires a complete drain down. In this instance, the pipework was poorly installed over 20 years...
17 Apr

Devonshire Place – London

Avoiding excavation works with the Aladdin EasyFit Isolator: HVL Solutions were called to Devonshire Place London W1, on arrival they needed to isolate water supply to an apartment which had no control over their water supply. Isolation was required to a 28mm copper line, with no isolation points available the only option...
17 Apr

Kier Group – Southwest Water

Meter Installations with the Aladdin EasyFit Isolator: We are using the Aladdin valves where there is no internal or external stop tap, proving an invaluable tool in our arsenal in enabling customers to have a meter fitted where previously we would have had to feedback as “unable to meter”. Wendy Coomber (Kier...
17 Apr

Bloomsbury Hotel

Completing much needed maintenance in a fully occupied hotel, whilst overcoming problematic seized gate valves with the Aladdin EasyFit Isolator: “Great product, fitted Aladdin EasyFit isolation valves to working mains in a 150 room hotel, all rooms fully occupied, by installing EasyFit isolation valves this allowed works to be completed...